RVSM

Tue, 31/08/2010
GULFSTREAM 1ST PART 91 OPERATOR TO USE NEW FAA AUTHORIZATION PLATFORM

The Gulfstream Aerospace Corp. Flight Operations department has reduced the time it takes to receive a reduced vertical separation minimum (RVSM) Letter of Authorization (LOA) from two weeks to just a few days,
Syndicate content