
GULFSTREAM
Thu, 02/09/2010MILESTONE FOR GULFSTREAM G250 INTEGRATION TEST FACILITY
Gulfstream Aerospace Corp.’s G250 Integration Test Facility (ITF) has accumulated 1,000 hours of testing on the PlaneView250™ software load that will be the basis for securing the aircraft’s initial Type Certificate.
Tue, 31/08/2010GULFSTREAM 1ST PART 91 OPERATOR TO USE NEW FAA AUTHORIZATION PLATFORM
The Gulfstream Aerospace Corp. Flight Operations department has reduced the time it takes to receive a reduced vertical separation minimum (RVSM) Letter of Authorization (LOA) from two weeks to just a few days,
Thu, 19/08/2010GULFSTREAM G550 AND G500 CERTIFIED FOR NEW ZEALAND REGISTRATION
Gulfstream Aerospace Corp. has received Type Certificate Validation (TCV) from the Civil Aviation Authority of New Zealand for the Gulfstream G550 and G500. The approvals allow operators to register the business jets in that country.
Thu, 15/07/2010GULFSTREAM G450 SETS SPEED RECORD
A large-cabin, long-range Gulfstream G450 business jet recently established a city-pair speed record between Tokyo and Hong Kong.
Thu, 01/07/2010FINAL GULFSTREAM G250 JOINS FLIGHT-TEST PROGRAM
Gulfstream Aerospace Corp. announced today that the third and final Gulfstream G250 test aircraft has joined the flight-test program. Gulfstream, a wholly owned subsidiary of General Dynamics (NYSE: GD),
Tue, 22/06/2010FOURTH GULFSTREAM G650 NOW IN FLIGHT TEST
A fourth aircraft is now part of the Gulfstream G650 flight-test program, Gulfstream Aerospace Corp. announced today.

